{"id":21945,"date":"2023-08-03T14:07:00","date_gmt":"2023-08-03T14:07:00","guid":{"rendered":"https:\/\/www.exergy-orc.com\/?p=21945"},"modified":"2024-01-17T14:12:04","modified_gmt":"2024-01-17T14:12:04","slug":"exergy-filipinlerdeki-mahanagdong-jeotermal-enerji-santrali-icin","status":"publish","type":"post","link":"https:\/\/exergyint.com\/tr\/exergy-filipinlerdeki-mahanagdong-jeotermal-enerji-santrali-icin\/","title":{"rendered":"EXERGY, F\u0130L\u0130P\u0130NLERDEK\u0130 MAHANAGDONG JEOTERMAL ENERJ\u0130 SANTRAL\u0130 \u0130\u00c7\u0130N EDC \u0130LE YEN\u0130 S\u00d6ZLE\u015eME \u0130MZALADI"},"content":{"rendered":"\n
Proje, mevcut buhar enerji santralinin kapasitesini art\u0131rmak i\u00e7in su geri kazan\u0131m\u0131 ORC \u00fcnitesi arac\u0131l\u0131\u011f\u0131yla 28 MWe sa\u011flayacak.<\/strong><\/p>\n\n\n K\u00fcresel temiz enerji teknolojisi sa\u011flay\u0131c\u0131s\u0131 ve yeni nesil jeotermal ORC enerji santrallerinde lider olan EXERGY INTERNATIONAL, Leyte, Do\u011fu Visayas, Filipinler\u2019de 28 MWe ikili sistemin tedari\u011fi i\u00e7in Energy Development Corporation (EDC)<\/strong> ile yeni bir s\u00f6zle\u015fme imzalad\u0131. Proje, Mahanagdong<\/strong> 180 MWe tek fla\u015f elektrik santralinin geni\u015fletilmesi olacak ve herhangi bir jeotermal saha geli\u015ftirme gerektirmeden ek elektrik \u00fcretmek i\u00e7in mevcut kullan\u0131lmam\u0131\u015f sudan yararlanacak.<\/p>\n Yeni enerji santrali, y\u00fcksek verimlilik ve g\u00fcvenilirlik sa\u011flayan Radyal D\u0131\u015f \u00c7\u0131k\u0131\u015fl\u0131 T\u00fcrbin ile \u00e7al\u0131\u015fan Exergy’nin geli\u015fmi\u015f ORC teknolojisini kullanacak ve b\u00f6ylece jeotermal kaynak kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karacak. Exergy, eksiksiz teknolojik \u00e7\u00f6z\u00fcm\u00fcn ve ilgili ekipman\u0131n tasar\u0131m\u0131ndan ve tedari\u011finden sorumludur. ORC tasar\u0131m\u0131, tek bir jenerat\u00f6re ba\u011fl\u0131 2 t\u00fcrbinli, iki bas\u0131n\u00e7 seviyeli bir \u00e7evrimden ve so\u011futma kuleli su so\u011futmal\u0131 bir yo\u011fu\u015fma sisteminden olu\u015fur. Kaynakta risk olmadan uygun \u015fekilde kullan\u0131lmas\u0131n\u0131 garanti etmek i\u00e7in bir asit dozaj sistemi ve t\u00fcm yeni enerji santralini kontrol edecek ve EDC kontrol sistemi mimarisine entegre edilecek bir DCS kontrol sistemi i\u00e7erir.<\/p>\n \u0130n\u015faat, Exergy ortakl\u0131\u011f\u0131nda EPC y\u00fcklenicisi olarak hareket eden JGC Filipinler Inc.<\/strong> taraf\u0131ndan ger\u00e7ekle\u015ftirilecek. JGC Filipinler, 30 y\u0131l\u0131 a\u015fk\u0131n bir s\u00fcredir Filipinler’de EPC ve i\u015fletme ve bak\u0131m hizmetleri sa\u011flamaktad\u0131r. Dikkate de\u011fer bir performans ge\u00e7mi\u015fi ve g\u00fc\u00e7l\u00fc uygulama yetenekleriyle projede Exergy’nin \u00f6nemli bir orta\u011f\u0131 olacaklar.<\/p>\n Santral faaliyete ge\u00e7ti\u011finde, yerel topluluklara ve end\u00fcstrilere 7\/24 a\u00e7\u0131k, temiz, g\u00fcvenilir ve istikrarl\u0131 jeotermal enerji sunarak CO2 emisyonlar\u0131n\u0131n \u00f6nemli \u00f6l\u00e7\u00fcde azalt\u0131lmas\u0131na katk\u0131da bulunacakt\u0131r.<\/p>\n Bu, Mindanao su geri kazan\u0131m projesinin 2022’de ba\u015far\u0131yla tamamlanmas\u0131n\u0131n ard\u0131ndan EDC taraf\u0131ndan Exergy’ye verilen ikinci sipari\u015ftir. Exergy International Genel M\u00fcd\u00fcr\u00fc Luca Pozzoni’<\/strong>nin de alt\u0131n\u0131 \u00e7izdi\u011fi gibi, bu, \u015firketler aras\u0131nda ba\u015flat\u0131lan de\u011ferli i\u015f ortakl\u0131\u011f\u0131n\u0131n \u00f6nemli bir teyididir:<\/p>\n \u201cMahanagdong enerji santralinin in\u015fas\u0131 i\u00e7in EDC taraf\u0131ndan bir kez daha tercih edilmekten onur duyuyoruz. Bu yeni sipari\u015f bize, EDC’nin karbonsuz bir gelecek misyonuna katk\u0131da bulunarak verimli bir i\u015fbirli\u011fini s\u00fcrd\u00fcrme f\u0131rsat\u0131 veriyor.” <\/em>S\u00f6zlerine \u015f\u00f6yle devam ediyor: \u201cBu hedef projenin ger\u00e7ekle\u015ftirilmesinde g\u00f6sterdikleri ba\u011fl\u0131l\u0131k ve s\u0131k\u0131 \u00e7al\u0131\u015fmalar\u0131ndan dolay\u0131 ekibimi ve ba\u015f\u0131ndan beri t\u00fcm faaliyetlerin geli\u015ftirilmesine bizzat liderlik eden Marco Frassinetti<\/strong>‘yi tebrik etmek istiyorum. Bu, Exergy’nin kaynak yat\u0131r\u0131m\u0131 yapt\u0131\u011f\u0131 ve varl\u0131\u011f\u0131n\u0131 daha da geli\u015ftirmek i\u00e7in \u00e7aba harcad\u0131\u011f\u0131, \u00f6nemli bir jeotermal potansiyele sahip, hala kullan\u0131lmam\u0131\u015f bir b\u00f6lge olan Asya Pasifik b\u00f6lgesindeki i\u015fimizi geni\u015fletmemize yard\u0131mc\u0131 olacak portf\u00f6y\u00fcm\u00fczdeki \u00f6nemli bir referanst\u0131r\u201d.<\/em><\/p>\n Enerji Geli\u015ftirme \u015eirketi Hakk\u0131nda Proje, mevcut buhar enerji santralinin kapasitesini art\u0131rmak i\u00e7in su geri kazan\u0131m\u0131 ORC \u00fcnitesi arac\u0131l\u0131\u011f\u0131yla 28 MWe sa\u011flayacak.<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","footnotes":""},"categories":[62],"tags":[],"class_list":["post-21945","post","type-post","status-publish","format-standard","hentry","category-news-tr"],"yoast_head":"\n
<\/strong>EDC, k\u00fcresel \u00e7apta \u00e7e\u015fitlendirilmi\u015f bir yenilenebilir enerji \u015firketidir. D\u00fcnyan\u0131n en b\u00fcy\u00fck jeotermal \u015firketi ve Filipinler yenilenebilir enerji sekt\u00f6r\u00fcnde lider olan EDC, toplam yakla\u015f\u0131k 1,5 GW kurulu kapasiteye sahip jeotermal, hidroelektrik, g\u00fcne\u015f ve r\u00fczgar enerjisi varl\u0131klar\u0131ndan olu\u015fan bir portf\u00f6ye sahiptir. Ana g\u00fc\u00e7 kayna\u011f\u0131 jeotermal olan EDC’nin 1.185,40 MW’\u0131, \u00fclkenin toplam kurulu jeotermal kapasitesinin yakla\u015f\u0131k %61’ini sa\u011fl\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"